Print

Arabian American Center January Training & Development
Program Title:
Power System Testing, Commissioning & Start Up
Location:
شرم الشيخ
Date:
22.01.2017 - 26.01.2017
Fees:
$ 3000

Description

Course Objective:

             On completion of this course participants will be able:
                 • To understand main concepts of management of reactive power.
                 • To discuss how to improve the quality of supply in A.C. Power System.
                 • To discuss how to use the generators, distribution networks, and equipment at full efficiency.
                 • To know how to select, calculate, connect the reactive power compensator to improve the

                    power factor, the voltage regulation and the load balancing in the utilities and industrial networks.
                 • To know the problems appear due to use compensation equipment and how to mitigate

                    those problems.

.

Who Should Attend:

      This course is intended for Junior & Senior Electrical Engineers, who work in operation, planning, maintenance, protection, control and analysis of Utilities & Industrial Electrical Networks.


COurse Contents:

              • Introduction
              • Fundamentals of Power Factor Correction:
              • Introduction, background and history
              • Terminology
              • Dielectric theory and review


              • Linear loads, nonlinear loads 
              • Power factor correction PFC
              • Standards and regulations 
              • Reactive Power compensation
              • Production and Absorption of Reactive Power.


              • Means of Reactive Power Compensation
              • Shunt reactors
              • Shunt Capacitors
              • Series Capacitors
              • Synchronous Condensers


              • Static VAR Compensator (SVC)
              • Distribution System Voltage Regulations.
              • Power Factor Correction
              • Importance of P.F. Correction
              • Problems Appear Due to Low Power Factor


              • Technical & Economical Benefits
              • Numerical Example
              • Capacitor Banks
              • Methods of Correction
              • Design Criteria & Selection


              • Procurement & Maintenance Cost
              • Fixed Capacitor Banks
              • Locations & Connections
              • Discussions
              • Automatic Capacitor Bank


              • Purpose
              • The VAR Regulators
              • Measurement & Adjustment of Cost
              • Adjustment Steps
              • Contactor And Fuses


              • Unsymmetrical Loads
              • Positive-, negative- and zero- sequence components
              • Effect of unbalanced operation on electrical loads
              • Power Measurements
              • Influence of Harmonics And Resonance


              • Protection Against Resonance 
              • Power Electronics Converters 
              • Power Semi-conductors
              • Fundamentals Pulse Width Modulation (PWM)
              • Single- phase converters


              • Three- phase converters
              • Harmonics and power factor correction
              • Reducing Power Factor Cost:
              • Why improve your power factor
              • Measurement Power Factor


              • Power Factor calculation 
              • Power Factor Equipment and testing
              • PF equipment
              • Operation PF equipment
              • Implementation equipment


              • Testing Power Factor

.A

30 Sobbhy Fahmey St. - Ard El-Golf - Heliopolis - Cairo - Egypt
Tel: +201001029959/+201066687900/+202 24199019 – Fax: +202 24170419
www.aactd.net E-mail: training@aactd.net
ISO 9001:2008 Certificate No. 01 100 105040 - TUV Rheinland - Germany – WWW.TUV.COM