Print

Arabian American Center October Training & Development
Program Title:
Safety valve & Flow Lines, Leakage, Damages
Location:
Cairo
Date:
02.06.2019 - 06.06.2019
Fees:
$ 2750

Description

Objectives:

      Upon the completion of this course, each participant will learn more:

               • About X-mass tree, wellhead equipment, mechanical barriers, safety valves and Wellhead

                   control system.

               • Develop a better understanding about wellhead operating procedures & working under safe

                  conditions.

               • They will be able to identify the relevant code & standards for Well head towers, wells,

                  pipeline, protection & safety systems.

               • To determine the location of leakage and damage of flow line.

               • To manage the flow line and valve for test

               • To prepare the flow line and valve for testing

               • To Understanding well testing procedures

               • To understanding the mechanisms ,function of headers

               • To explain the theory and mechanisms of relief and check valves


Audience

   Field operations, production, petroleum, reservoir and field engineers and other staff interested in X-mass trees & wellhead operations and testing, Operation Engineer  and Everybody who are responsible for selecting, or repairing safety relief valves.


Daily Contents:

        DAY 1:

               • BOTTOM HOLE COMPLETION TECHNIQUES

                                Open Hole Completion

                                Screen or Pre-slotted Liner Completions

                                Cemented and Perforated Casing / Liner


               • Selection of flow conduit between reservoir and surface

                                Tubing Casing Flow

                                Casing and Tubing Flow

                                Tubing Flow without Annulus Isolation

                                Tubing Flow with Annular Isolation


               • COMPLETION STRING FACILITIES

                                Basic Completion String Functions and Facilities

                                Additional Completion String Functions


               • COMPLETION STRING COMPONENTS

                                Wellhead / Xmas Tree

                                Production Tubing

                                Provision of an Annular Pressure Seal

                                Provision of a Seal between Tubing and Packer

                                Sub-Surface Safety Valves

                                Side Pocket Mandrel (SPM)

                                Sliding Side Door (SSD)

                                Landing Nipples

                                Perforated Joint


        DAY 2:

               • WELLHEAD SYSTEM

                                Wellhead Function

                                Christmas Tree Function

                                Tubular

                                Typical Wellheads

                                Casing Head

                                Intermediate Casing Head

                                Tubing Head

                                Christmas Tree Assembly


               • CHRISTMAS TREE

                                Master Valves

                                Flow Tree

                                Wing Valve

                                Choke

                                Crown Valve

                                Valve Operation


               • SUSPENSION METHODS

                                Casing Suspension

                                Automatic-Type

                                Non-Automatic-Type

                                Mandrel-Type

                                Tubing Suspension

                                Double-Box Method

                                Adapter Flange Method

                                Mandrel Method

                                Slip Suspension Method


               • SPECIAL WELLHEAD EQUIPMENT

                                Tubing less Wellheads

                                Multiple Completion Wellheads

                                Ground Subsidence Wellheads

                                Injection Wellheads

                                Artificial Lift Wellheads


        DAY 3:

               • Well Control - Chokes

                                Principles of Operation

                                Types of Chokes

                                Choke Operation

                                Safety Practices for Operating Well Stream Gathering Systems

                                Inlet manifold and Flow line


               • Pressure-Relieving Devices:

                                Relief-Valve;

                                Safety Valve;

                                Safety Relief Valve;

                                Rupture Disc;

                                Conventional Safety Relief Valve;

                                Types and Functions of Pressure Relieving Devices   

                                Valve Operational;

                                Relief-Valve and Safety Valve Components;

                                Force within Relief-Valve;

                                Valve Body;

                                Nozzle and Flans;

                                Seating;

                                Seal;


               • Wellhead and flow line

                                Check for wellhead pressure

                                Flowline pressure failure analysis

                                Prepare flow line for test

                                Flowline test for leakage and damage

                                Repair and replacement

                                Procedure for flow line test according to standard

                                HSE incident to line management


               • Well testing   

                                Well testing analysis

                                Results and data reporting & analysis

                                Testing for flow rate

                                Testing for water cut

                                Testing for GOR

                                Testing for other  parameters

                                Results Calibration and accuracy


               • Operation troubleshooting

                                Troubleshooting of safety valve

                                Troubleshooting of check valve

                                Relief system failure analysis

                                Root cause analysis


               • Production Operation Optimization    

                                Check for GC equipment as one unit

                                Well assembling affect on production rate

                                Back pressure & production rate relationship

                                Operation according to international standard

                                Operation according to international procedures

                                Production optimization using check system analysis


30 Sobbhy Fahmey St. - Ard El-Golf - Heliopolis - Cairo - Egypt
Tel: +201001029959/+201066687900/+202 24199019 – Fax: +202 24170419
www.aactd.net E-mail: training@aactd.net
ISO 9001:2008 Certificate No. 01 100 105040 - TUV Rheinland - Germany – WWW.TUV.COM